10 · Note 05 — Production Readiness Review

Status: Outline. Body fills in Week 4. Voice: principal-level, BFSI-threaded, Apic-calibrated.

What this file is. The checklist a principal architect runs before giving the green light for BFSI production go-live — the complete PRR template with seven sections and five hard no-go criteria.

What this file is NOT. A generic launch checklist — every item here is calibrated to regulated BFSI deployment of a Claude-based AI system.


Why a formal PRR matters in BFSI

Banks don't ship fast and fix later. RBI's IT governance guidelines (Circular RBI/2023-24/73) require documented risk assessment and sign-off before production deployment of AI systems that touch customer data or customer-impacting processes. The CISO is not a stakeholder who reviews and provides input — the CISO is a gatekeeper with veto power.

The PRR is your evidence package. It proves to the CISO, the CTO, and the regulator that you have:

  1. Validated the system does what it claims
  2. Designed for failure
  3. Controlled cost
  4. Met latency commitments
  5. Built the safety and audit infrastructure
  6. Planned for rollback

Without a formal PRR, you do not go to production. With a PRR, you have a documented artifact that survives personnel changes and satisfies audit.


PRR Section 1: Eval gate passed

The question: Has the system been evaluated against defined success criteria, and do those results hold on the production data distribution?

Evidence required:

  • [ ] Faithfulness score ≥ defined threshold (e.g., >85% on RAG eval set for SOP search)
  • [ ] Hallucination rate < threshold (e.g., <2% fabricated citations in compliance review)
  • [ ] Safety eval passed: red-team adversarial prompts tested; refusal rate on disallowed queries >99%
  • [ ] Regression suite defined and passing: adding new features does not degrade existing behavior
  • [ ] Eval set is drawn from real production-like data (not synthetic only) and reviewed by domain SMEs
  • [ ] Eval results reviewed and signed off by use-case product owner + CISO reviewer

Common failure mode: Eval is done on synthetic/clean data that doesn't reflect how real users interact with the system. A support agent that scores 92% faithfulness on curated test queries and 71% on real production queries is not ready. The eval distribution must match the production distribution.

BFSI-specific requirement: For compliance review (UC4), the eval must include a "false negative" rate — cases where the system misses a compliance violation. This is more dangerous than a false positive. The threshold for false negatives in compliance review must be agreed with the Compliance team and documented in the PRR.


PRR Section 2: CISO review signed off

The question: Has the security and privacy design been reviewed and approved by the CISO's office?

Evidence required:

  • [ ] Threat model documented and reviewed (see Module 09): prompt injection, data exfiltration, privilege escalation, adversarial misuse vectors identified
  • [ ] Data flow diagram approved: shows every path that customer/employee data can take, confirms no data leaves India
  • [ ] RBAC design implemented and tested: roles mapped to Claude tool access, tested with role-specific test accounts
  • [ ] Audit log design approved by CISO: fields defined, retention confirmed (7 years), immutability mechanism in place
  • [ ] PII handling reviewed: no PII in prompt text that exits to Claude without classification and approval; masking implemented where required
  • [ ] Incident response playbook for AI-specific incidents documented (prompt injection attempt, unexpected refusal spike, data exfiltration attempt)
  • [ ] DPDPA 2023 data processing notice reviewed by Legal: users informed that AI processes their data where legally required

The CISO sign-off is a physical signature (or DocuSign equivalent) on the PRR document. Not an email. Not a Slack acknowledgment. A documented approval. This is what survives the audit.


PRR Section 3: Cost model validated

The question: Is the projected cost based on real pilot data, and have we tuned caching to the level we claimed?

Evidence required:

  • [ ] Pilot cost actuals: compare pilot cost per call (actual) vs. projected cost per call (model)
  • [ ] Variance explained: if actual > projected by >20%, root cause identified (e.g., cache hit rate lower than assumed, output tokens higher than assumed)
  • [ ] Caching tuned: cache hit rate in pilot ≥ target (e.g., >80%) for all use cases using prompt caching
  • [ ] Monthly cost projection reviewed by Finance: sign-off on projected spend and budget allocation
  • [ ] Budget cap controls implemented: per-use-case daily budget caps in place, alert at 80%, hard stop at 110%
  • [ ] Batch vs. synchronous split validated: all eligible offline workloads (UC4 nightly review, UC6 reports) confirmed on Batches API

The cost model validation is not theoretical. Run the pilot for at least 2 weeks with representative traffic before PRR. Model projections can be off 2–3× if the cache hit rate assumption was wrong.


PRR Section 4: Latency budget verified

The question: At expected production load, does the system meet the latency SLA specified for each use case?

Evidence required:

  • [ ] Load test executed at 150% of expected peak traffic (use case volumes from capacity plan)
  • [ ] p50 and p99 TTFT measurements match design targets (see Note 02) at peak load
  • [ ] Streaming enabled and tested: first visible token time verified in UI under realistic network conditions (not localhost)
  • [ ] Cache cold-start latency measured: TTFT at cache miss acceptable even if higher than cache-hit case
  • [ ] Regional latency verified: load test run from ap-south-1, not from developer laptop in a different region
  • [ ] Latency at Bedrock confirmed: not just first-party API; Bedrock-specific TTFT captured (there is variance)

Common failure: Load test is run from the development environment (same region, low latency, warm cache). Production latency is 2× worse. Always test from the production environment or a faithful replica.


PRR Section 5: Reliability runbook

The question: Does the team know what to do when Claude fails, and have they practiced it?

Evidence required:

  • [ ] Fallback hierarchy documented and tested in staging: all five levels (retry, downgrade, cache, human escalation, degradation message)
  • [ ] Circuit breaker tested: manually injected failures at rate limit to confirm circuit opens at defined threshold
  • [ ] Graceful degradation UX verified: agent UI tested in "Claude unavailable" state; no error messages exposed to end customers
  • [ ] Human escalation path tested end-to-end: mock incident where Claude unavailable → Genesys routing fires → human agent queue receives volume spike → confirm capacity
  • [ ] On-call rotation defined: who gets paged for a P1 Claude API outage (not just "the infra team")
  • [ ] Runbook page in internal wiki: step-by-step incident response, specific commands, escalation path, Apic/Bedrock support contact

The runbook test is not theoretical. Run a game day: inject failure into staging, have the on-call team run the runbook from scratch without guidance. Document what broke. Fix it. Re-run.


PRR Section 6: Rollback plan

The question: If we need to revert this deployment in the first 30 days, how do we do it and what triggers the decision?

Evidence required:

  • [ ] Rollback trigger criteria defined: specific metrics that trigger a rollback decision (e.g., refusal rate >15% sustained, false negative rate in compliance review >5%, p99 latency >3× SLA for 24 hours)
  • [ ] Rollback mechanism documented: feature flag toggle, blue/green switch, or manual reversion — which one and how long does it take
  • [ ] Pre-Claude fallback path validated: the system that existed before Claude integration still works; it has not been decommissioned
  • [ ] Data state after rollback: are there any Claude-generated data artifacts that need to be invalidated or reviewed post-rollback?
  • [ ] Communication plan: who is notified when rollback is triggered (users, business units, CISO)

The most common rollback mistake: Decommissioning the pre-Claude system (the old rule-based SOP search, the human-only compliance queue) before the Claude integration is proven stable. Keep the previous system on life support for 90 days post go-live. The cost of maintaining it for 90 days is negligible compared to having no rollback path.


PRR Section 7: Monitoring live

The question: Are dashboards, alerts, and audit logs active and verified before the first production traffic hits?

Evidence required:

  • [ ] All metrics listed in Note 04 are actively collected in production environment (not just staging)
  • [ ] All P1 and P2 alerts have been test-fired and confirmed to reach PagerDuty
  • [ ] Cost dashboard shows data from the pre-launch smoke test
  • [ ] Audit log in Splunk: smoke test log events appear, query confirmed by CISO team
  • [ ] Datadog APM traces visible for smoke test requests
  • [ ] On-call team has been briefed on the dashboard; they can navigate it without assistance
  • [ ] First 48-hour post-launch: dedicated monitoring shift (rotation) watching the dashboards in real time

The "monitoring live before go-live" rule is absolute. Never launch and then set up monitoring. If the monitoring isn't live, the go-live date moves.


The five hard no-go criteria

These five conditions auto-block production regardless of timeline pressure, business urgency, or seniority of the person asking you to proceed:

# No-go condition Why it's absolute
1 Eval gate not passed Deploying an unvalidated system into a regulated environment is a compliance violation, not a calculated risk
2 CISO sign-off not obtained RBI IT governance requires it; proceeding without it creates personal liability for the approver
3 Monitoring not live You cannot know if the production system is behaving correctly without observability in place
4 Rollback plan has not been tested An untested rollback plan is not a rollback plan
5 Audit log not operational DPDPA 2023 requires demonstrable data processing records from the first transaction; there is no retroactive fix

How to hold the line when pressured:

The business will push. A go-live date will be on a slide. An executive will say "we'll sort the monitoring later." The principal architect's job is to say no without losing the relationship.

Script: "I understand the date is important. If we go live today without the audit log, the first RBI inspection creates a material finding that could delay or suspend the entire program. The 5-day delay to complete the logging setup protects the program. I can help scope what's needed this week — but I can't sign the PRR without it."


Cross-references


Strong-Hire bar for this file

  • Articulates all seven PRR sections with concrete evidence requirements, not vague checklist items
  • Names the five hard no-go criteria and has a credible script for holding the line under pressure
  • Specifies BFSI-specific requirements in each section (RBI, DPDPA, CISO sign-off format)
  • Understands that the CISO's sign-off is a formal approval, not an informal acknowledgment
  • Recommends keeping the pre-Claude system alive for 90 days as the rollback path — practical engineering judgment